Hello, welcome to Foshan Jiana Decoration Materials Co., Ltd.!

中文 English

Service Hotline:

13516576892

北京铝方通

news

Product Categories

products

Hot key words

hot key words

Contact us

contact us

Foshan site: No.1, Dayuan Village, Gangyaoling, Guanyao Group, Nanhai District, Foshan City

Tel: 0757-88773902

Tel: 0757-88773903

Mobile: 13516576892

Beijing site: No.1, Row 3, No. 15, Laozhong Road, Daxing

Tel: 010-56246098

Fax: 010-67959228

Mobile: 13311178946

Website: en.fsjnjc.cn


How does the control of the key nodes of the aluminum-magnesium-manganese roofing panel operate?

Your current location: Home >> News >> technical knowledge

How does the control of the key nodes of the aluminum-magnesium-manganese roofing panel operate?

Date of release:2019-03-20 Author: Click:

The aluminum-magnesium-manganese roof panel is mechanically occluded to connect the board to the board. The board and structural layer are supported by aluminum alloy fixed seat. The T-type code is hidden inside the rib. The dark buckle type is used. The whole slope roof is made up of several singles. The board consists of a slat on the roof.

1, the corner, the ridge

The treatment of the roof angle is an important part of the roof waterproofing project and the guarantee of the construction quality of the roofing works. Multiple waterproof methods are needed to handle the nodes. After years of construction, the node processing is also scientific and effective.

The port plate on the roof panel and the aluminum alloy support of the roof panel are fixed by rivets. In order to prevent the roof panel from sliding due to temperature changes; or the roof panel is affected by external force, the roof panel is not tight due to the undercut.

2 Firstly, the installed roof panel port is crimped, and the curling height is about 50mm. In order to prevent roofs with small slopes, water leaks into the roof due to rain. Even if it is necessary to make a large slope to the roof, it can be prevented from being poured under the roof panel due to wind and rain.

The aluminum alloy sealing member is combined with the foam sealing strip, and the aluminum alloy sealing member matching the plate shape is firstly fixed with the waterproof rivet of the roof panel rib, and the ridge foam conforming to the plate type is inserted behind the sealing member. The sealing strip is then fixed in the middle with the ridge cover and the seal, so that even if the exposed rivet leaks, the rain drops on the roof panel instead of the room, and the seal and the sealing strip are factory prefabricated products.

铝镁锰屋面板

2, the corner of the corner, the roof panel and the gutter edge

The quality of the roof corner will directly affect the roof waterproofing and roofing safety, otherwise there will be the possibility that the roof panel will be picked up by the wind.

The distance between the roof strips at the edge of the 1st ditch and the gutter is 100mm.

2 The lower port of the roof panel is subjected to hemming treatment to form a water droplet mouth shape.

A flooding plate is installed under the roof panel, and a 1.5mm galvanized steel plate attachment is built in for processing. The flooding plate provides water resistance and a variety of materials inside the roofing system to prevent exposure.

4 Set a water retaining plate on the rib of the roof panel. Generally, the slope of the metal roof is large, and the speed of the rainwater diving is very large. In order to prevent the rainwater from entering the opposite roof panel, the water flap can be used to slow down the rainwater.

3. Strengthening the weak links

For the weak links such as the side of the penetrating material and the gable, the general practice is to simply connect the flooding of the gable cover with the most edge rib of the roof panel with self-tapping screws, and the nail holes must penetrate the inside and outside of the roof. Once the seal fails, Water leaks. The practice of weak areas must be meticulous, and scientific, reasonable and reliable solutions should be studied.

Firstly, the prefabricated aluminum alloy gable groove is fixed to the rib of the roof panel with rivets, and then the buckle is fastened by the girder fastener to be fixed with the fixing seat, so that the buckle groove is firmly fixed, and then the prefabricated T-shaped adjustable buckle groove is fixed. The card is stuck on the buckle groove, and finally the gable water is fixed by the rivet on the T-shaped adjustable buckle groove. Since the exposed rivet hole does not pass through the roof panel, there is no loophole.


 


The address of this article:http://en.fsjnjc.cn/news/365.html

Key word:铝镁锰屋面板价格,北京铝镁锰屋面板,铝镁锰屋面板厂家

Recently browse:

Foshan Jiana Decoration Materials Co., Ltd.

Foshan site: No.1, Dayuan Village, Gangyaoling, Guanyao Group, Nanhai District, Foshan City

Tel: 0757-88773902/88773903

Fax: 0757-81776000/85774821

Beijing site: No.1, Row 3, No. 15, Laozhong Road, Daxing

Tel: 010-56246098

Fax: 010-67959228

Website: en.fsjnjc.cn


  • Service
  • number
    13311178946
  • Message
  • web site
  • Online Service